Case study cover: DG Breakdown Response, backup power restored in 30 minutes

Overview

The 1010 kVA diesel generator is the facility's emergency backup power source. On 12 August 2026 it failed to start during a utility power failure, causing a temporary interruption of backup power that affected facility operations.

Downtime was 30 minutes, measured from the failed start to normal operation.

30 minTotal downtime, from failed start to normal operation

The Challenge

During the utility power failure, the 1010 kVA DG received its start command but did not crank. Backup power was briefly lost and facility operations were affected.

The maintenance team responded immediately and began troubleshooting. Their inspection found that the starting battery voltage had fallen below the level needed to turn the engine over.

What the client neededBackup power restored quickly, and a way to make sure the same failure would not happen again.

Get the Full Case Study

Read how the cause was identified, the five corrective actions taken, the six preventive measures introduced, the outcome and the key lessons.

  • Immediate cause, root cause and contributing factors
  • Five-step corrective action timeline
  • Six preventive measures now in place
  • Outcome and key lessons

PDF · 4 pages

Fill in your details to download

We'll email the PDF to you and show a download link below. We don't share your details.

Keep Reading

More Case Studies

View All Case Studies
Case study cover: Washroom Odour and Hygiene Improvement
Housekeeping ยท Hinjewadi, Pune

Washroom Odour and Hygiene Improvement

A strong, unpleasant smell had spread through an entire washroom. The housekeeping team traced the possible causes and set corrective and preventive plans.

4 levelsof inspection

Let's Talk About Your Facility

Share your site details and what you want to improve. Logicon will review your requirements and discuss a suitable plan and quotation.

Talk to Our Team